AGOR status report

S Brandenburg*, T Nijboer, H Post, LP Roobol, HW Schreuder, S van der Veen

*Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingConference contributionAcademicpeer-review

Abstract

The past three years of AGOR operation have been a period of steady improvement of the cyclotron. The two problems causing most down time: failure of the helium refrigerator system and water leaks in the RF acceleration electrodes have been solved. The latter required redesign of the connection between the electrode and the coaxial line and a four month shutdown to implement the modifications.

Original languageEnglish
Title of host publicationCYCLOTRONS AND THEIR APPLICATIONS 2001
EditorsF Marti
Place of PublicationMELVILLE
PublisherAMER INST PHYSICS
Pages99-101
Number of pages3
ISBN (Print)0-7354-0044-X
Publication statusPublished - 2001
Event16th International Conference on Cyclotrons and Their Applications -
Duration: 13-May-200117-May-2001

Publication series

NameAIP CONFERENCE PROCEEDINGS
PublisherAMER INST PHYSICS
Volume600
ISSN (Print)0094-243X

Other

Other16th International Conference on Cyclotrons and Their Applications
Period13/05/200117/05/2001

Cite this