Abstract
The longitudinal phase stability of the CLIC main and drive beams is a crucial element of the CLIC design. In order to measure and control the phase a distributed phase monitoring system has been proposed. The system measures the beam phase every 900 m. The relative phase between the measurement points is synchronized with an external reference system via a chain of reference lines. This paper presents the simulations of error propagation in the proposed distributed monitoring system and the impact on the drive and main beam phase errors and the luminosity. Based on the results the error tolerances for the proposed system are detailed.
Original language | English |
---|---|
Title of host publication | LINAC 2012 - International Linear Accelerator Conference 2012 |
Pages | 16-18 |
Number of pages | 3 |
Publication status | Published - 2012 |
Externally published | Yes |
Event | 26th International Linear Accelerator Conference, LINAC 2012 - Tel Aviv, Israel Duration: 9-Sept-2012 → 14-Sept-2012 |
Conference
Conference | 26th International Linear Accelerator Conference, LINAC 2012 |
---|---|
Country/Territory | Israel |
City | Tel Aviv |
Period | 09/09/2012 → 14/09/2012 |